A school building is only genuinely free during holidays and short breaks. Placing furniture in an occupied corridor during term is slow, disruptive and risky for both staff and students. Confirm the academic calendar before booking anything, and separate workable windows from blackout periods — exam weeks, enrolment days and inspection visits.
For projects across several buildings, sequence by building rather than by product, so one site is finished and handed back before the next begins. Where the whole order cannot arrive at once, a phased delivery across successive breaks is usually more manageable than one large delivery compressed into a single week. Confirm whether out-of-hours or weekend working is permitted, who supervises access, and what those hours cost.
Survey the route to the room before pricing the job. The last thirty metres cause more delay than the shipping leg.
Door widths and turns, including any fire doors that must stay closed.
Stairs versus lift: check the lift's internal dimensions and load limit, not just its capacity.
External access: kerbside delivery, ramp gradients, gate widths and parking restrictions.
Holding space on site, and whether the floor there can take a stacked load.
Assembly responsibility must be settled in writing. Flat-packed items shift labour to the school's budget, while pre-assembled items occupy more shipping volume. List the tools required, the number of people needed for the largest item, and whether assembly hardware is bagged per unit. Decide who removes packaging waste: leaving cartons on site is often the single biggest complaint from a school, and a pre-booked waste collection is cheaper than a late removal.
Protect the route as well as the room. Corridor floor protection, corner guards and lift protection cost little against replacing a damaged floor or a marked wall. Stability matters too: tall storage and locker banks must be fixed back according to the installation instructions before a room is used.
Walk the completed installation together with the school before the crew leaves. Record snags room by room — damaged edges, missing fixings, doors that do not close flush — photograph them and agree a correction date. A signed handover with a snag list and the spare parts and documentation package closes the project cleanly.